Engineering and Delivery
Reports and Acceptance Tests
- Interim Report
- An interim report to NSIF
- UAT
- User Acceptance Test Schedule
- Proposal
- Original Proposal
- Project Charter
- Project Charter as agreed
- Meta-Data Status
- Details on the status of meta-data transferred to the pilot portal
- Feedback on NGI Meta-Data
- Feedback was provided in respect of the NGI meta-data received
- Transfer Log
- A log of transfers made from the original portal to the pilot portal
- User List
- A list of users transferred from the original portal to the new one
- User Requirements Statement