You are here: Home Documents Engineering and Delivery

Engineering and Delivery

Reports and Acceptance Tests

Interim Report
An interim report to NSIF
UAT
User Acceptance Test Schedule
Proposal
Original Proposal
Project Charter
Project Charter as agreed
Meta-Data Status
Details on the status of meta-data transferred to the pilot portal
Feedback on NGI Meta-Data
Feedback was provided in respect of the NGI meta-data received
Transfer Log
A log of transfers made from the original portal to the pilot portal
User List
A list of users transferred from the original portal to the new one
User Requirements Statement
 
Document Actions